4-Floor Office Building 50kW Solar Energy Storage System Project​

Facebook
Twitter
LinkedIn
WhatsApp

CCLAMP 50kW Solar Energy Storage System Summary​

Date: April, 2024

Type: Commercial Solar Hybrid System

Location: Bangkok, Thailand​

Customer: 4-Floor Office (600㎡, 80 employees)

Product Series: CCLAMP 50kW Inverter, 550W PV Panel, 215.04kWh Rack-mounted Battery​

Configuration: 1×50kW inverter, 2×215.04kWh batteries (430.08kWh total), 120×550W PV panels (66kW total), intelligent management system, tropical-resistant accessories, electrical protection devices.​

This project involves a 50kW inverter-based solar power system deployed in Thailand, designed to provide a stable power supply to areas with limited grid access and high generator costs. The system is designed to handle the daily power consumption of a typical four-story office building and supports future upgrades and expansions.

Customer Challenges

– 2-4 hours of power outages per month during the dry season disrupt operations and impact data security.

– Heavy operational burden due to high electricity costs for industrial and commercial users.

– High temperature and humidity affect equipment stability and lifespan.

– Grid fluctuations can damage IT equipment and increase maintenance costs.

– Must be TISI certified and comply with MEA grid standards.

– Adapt to peak electricity demand periods from 9:00 AM to 6:00 PM, achieving intelligent peak shaving.

CCLAMP Commercial Solar Energy Storage Solution​

Tailored 50kW solution for Thailand’s solar resources (7-8h daily sunlight), solving outages, cost reduction and compliance.​

Key Advantages:​

-Performance: 120×550W PV panels (66kW, 23.2% efficiency, anti-UV); 1×50kW inverter (98.2% efficiency, 60℃ resistant, IP65); 2×215.04kWh batteries (≥6000 cycles, -dehumidification/temperature control). All TISI certified.​

-Technology: Intelligent power allocation, 0.05s outage switch, APP monitoring, voltage stabilization, humidity control.​

-Efficient energy management to prioritize solar usage and reduce generator dependency

Project Results & Impact​

-3 outages in 2 months: 0.05s seamless switch, 100% operational continuity, no data loss.​

-Monthly generation 5,280kWh (88% of demand); monthly bill ↓ to 2,844 Baht, annual saving ~249,072 Baht.​

-Stable in 32-38℃ and monsoon rains; dehumidification cuts maintenance by 50%.​

-No power-related equipment damage in 2 months, saving ~12,000 Baht.​

-TISI/MEA compliant; 32.6 tons annual carbon reduction, aligning with Thailand’s 2037 30% renewable target.​

FAQ​

Q1: Meet 200kWh/day?

A: Yes, 176kWh/day from PV, 24kWh from batteries, grid supplements balance.​

Q2: Battery backup?

A: 430.08kWh supports 10-12h operation, coping with planned outages.​

Q3: Tropical adaptation?

A: Anti-UV PV, waterproof inverter, dehumidifying batteries ensure stability.​

Q4: Local compliance?

A: TISI/MEA certified; eligible for BOI 8-year tax exemption.​

Q5: ROI?

A: 5-6 years with BOI incentives, 20+ years of benefits.​

Contact us for pricing, technical support and Thailand-tailored commercial solar solutions.

Featured Solutions

RELATED SOLAR POWER SYSTEM & LIGHTING SOLUTIONS

CCLAMP LD 100W All-in-One Solar Street Lights for Philippine Rural Roads

Philippines LD 100W Solar Street Light Project Date: June, 2023 Type: Off-Grid Rural Road Solar Lighting Location: Philippines Product: CCLAMP 100W All-in-One Solar Street Light | Installation: 7m Pole Height This project deployed CCLAMP LD 100W integrated solar streetlights in the Philippines, designed to provide reliable nighttime lighting without relying on grid power. Their integrated design (solar panel + lithium iron phosphate battery + controller + LED) allows for rapid installation and simplifies maintenance in areas with limited infrastructure. Customer Challenges – Tropical monsoon climate: High annual rainfall and frequent typhoons necessitate superior waterproofing, typhoon resistance, and corrosion resistance. – Traditional streetlights are expensive to install, requiring trenching and wiring.

Read More »

CCLAMP LD 80W All-in-One Solar Street Lights in Bangladesh

LD 80W Solar Street Light in Bangladesh Project Summary Date: March, 2024 Type: Off-grid town street lighting solar street light Location: Bangladesh Product: CCLAMP 80W All-in-One Solar Street Light installed at 7m Pole Height This project deployed CCLAMP LD 80W integrated solar streetlights in urban streets of Bangladesh. The solution was tailored to Bangladesh’s tropical monsoon climate (heavy rain, high humidity, frequent flooding) and weak infrastructure (severe power outages, insufficient building resources), emphasizing cost-effectiveness, rapid installation, and climate adaptability. This helped contractors overcome local challenges and complete projects on time and within budget. Customer Challenges – Tropical monsoon climate: Annual rainfall of 1429-4338 mm, humidity of 60%-98%, frequent floods and

Read More »

CCLAMP LD 120W All-in-One Solar Street Lights in Malaysia

Project Summary Date: January, 2024 Type: Off-Grid  Rural Main Roads Solar Lighting Location: Malaysia (Sabah) Product: CCLAMP LD 120W All-in-One Solar Street Light,Installed at 7M This project in Sabah deployed CCLAMP LD 120W integrated solar streetlights along rural main roads, mounted on 7-meter-high poles. Designed specifically for Malaysia’s tropical climate (high temperature, high humidity, and heavy rainfall) and the needs of contractors, these streetlights are corrosion-resistant, waterproof, and quick to install, helping contractors complete projects on time and within budget. Customer Challenges – Tropical climate: Annual rainfall of 2000-3000 mm, average humidity of 80%, requiring extremely high waterproof and corrosion-resistant properties. – Unstable power grid (5-7 hours of power outages

Read More »

ANERN UPDATES

A Complete Guide to Choosing Solar Street Lights in 2026

Choosing the right solar street light is crucial for ensuring long-term stability, energy efficiency, and cost savings—especially in 2026, as solar technology advances and project requirements become more diverse. This guide takes you step by step from basic cognition to practical selection, helping you avoid common pitfalls. Step 1: Clarify...

Established PV Module Factory in 2026 and Started Production

In 2026, a photovoltaic module factory was completed and put into operation. In September 2025, Meizhou Chuangfu New Energy Co., Ltd., a professional photovoltaic module production base located in Meizhou City, Guangdong Province, was officially established. After several months of preparation and construction, the factory officially commenced production in February...

Projects3

Our journey started with a clear vision: to bring reliable and efficient lighting solutions to the market. We officially entered the LED lighting industry, focusing on light sources, commercial lighting, and outdoor architectural illumination.

Please fill up your requlrement, our sales staff will contact you in time.Thank you!